    摘要:

    针对变电站一键顺控存在验收难度大、改造停电难等问题,提出基于数字孪生技术的一键顺控功能仿真验证方法,在仿真环境构建变电站一键顺控功能仿真验证平台。基于仿真验证平台,模拟站内一、二次设备状态变化,在设备不停电情况下,开展一键顺控功能验证测试,对变电站一键顺控系统配置文件进行全面校验。通过工程实际应用,所提方法与传统人工验收方式相比,验证逻辑更细、更全,基于仿真验证方法,可模拟顺控各种校验条件,提升顺控配置文件逻辑校验的全面性; 验收效率更高,验证测试工作可在新建、改造工程开始前开展,提前发现顺控配置文件中存在的问题,确保现场工作顺利实施,从而缩短工程建设周期,提升变电站一键顺控验收质效。

    Abstract:

    In order to solve the problems of one-key sequence control in substation, such as difficult acceptance and difficult transformation of power outage, a simulation verification method of one-key sequence control function based on digital twin technology is proposed, and a simulation verification platform for one-key sequence control function in substation is constructed in simulation environment. Based on the simulation verification platform, the state changes of primary and secondary equipment in substation are simulated, and the one-key sequence control function verification test is carried out without power outage of the equipment, and the configuration file of one-key sequence control system in substation is comprehensively verified. Through practical engineering applications, the proposed method is compared with the traditional manual acceptance method. Firstly, the verification logic is more detailed and comprehensive. Based on the simulation verification method, it can simulate various verification conditions of sequence control and improve the comprehensiveness of logic verification of sequence control configuration files. Secondly, the acceptance efficiency is higher. The verification testing work can be carried out before the start of new construction and renovation projects. Problems in the sequence control configuration files can be discovered in advance to ensure the smooth implementation of site work, thereby shortening the construction cycle of the project and improving the acceptance quality and efficiency of one-key sequence control in substation.

    参考文献
    相似文献
    引证文献
引用本文
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2024-11-11
  • 出版日期: