Abstract:The large scale load input of coal-to-electricity has caused a great load burden to the weak distribution network, and during the peak period, the number of electric heating equipment used by users continues to increase and the use time gradually extends, resulting in heavy load and overload operation of local stations and lines, which has brought threats to the safe and stable operation of Turpan power grid. In consideration of grid frame for coal-to-electricity load access to distribution network, the access mode and equipment types of coal-to-electricity project in Turpan are firstly investigated, and the standardized configuration mode of coal-to-electricity and product classification statistics are established. Then, based on the equivalent thermal parameter model of circuit simulation, the operating mechanism model of typical electric heating configuration mode is established, direct load control (DLC) technology is studied for load control of coal-to-electricity conversion. Finally, the heavy overload operation areas in Turpan that has completed coal-to-electricity conversion is analyzed, and the operation of transformers is controlled within the boundary by the dispatching control strategy successfully, and it does not affect the thermal comfort of user heating.