Abstract:Combined with the action recording of protection device, an accident in which multiple sets of protection devices act at the same time is analyzed. The explosion takes place in the voltage transformer of incoming switch line in a substation, and this causes the simultaneous action of the line protection of this interval and line protection of adjacent interval as well as line protection of the upper substation and backup protection in the main transformer. Because the protection coordination seems unreasonable, the fault waveform and the protection action are analyzed and discussed in depth. It is found that during this fault,there are many times of shortcircuit fault conversion, there is no problem in the cooperation of various protection devices, and the protective devices acted correctly.