Abstract:An explosion failure of 110 kV main transformer bushing is introduced, and it is analyzed in detail with oil chromatogram and bushing inspection. The results show that the rubber pad of oil filling hole of transformer bushing becomes ageing and deformed, the compression is reduced and there is sealing failure resulting in damp condition, which is the root causes of the failure. Finally, the corresponding improvement measures are proposed.