An explosion failure of 110 kV main transformer bushing is introduced, and it is analyzed in detail with oil chromatogram and bushing inspection. The results show that the rubber pad of oil filling hole of transformer bushing becomes ageing and deformed, the compression is reduced and there is sealing failure resulting in damp condition, which is the root causes of the failure. Finally, the corresponding improvement measures are proposed.
参考文献
相似文献
引证文献
引用本文
李 林,廖文龙,邓 勇.一起110 kV主变压器套管受潮导致的故障分析[J].四川电力技术,2021,44(5):91-94. Li Lin, Liao Wenlong, Deng Yong. Failure Analysis on Bushing Affected by Damp for 110 kV Main Transformer[J]. SICHUAN ELECTRIC POWER TECHNOLOGY,2021,44(5):91-94.