Abstract:With the continuous increase of loads and lines, urban distribution networks are facing many production pressures and equipment problems. Power grid companies often implement urban distribution automation systems to solve these problems. However, due to the complex operation indicators of their construction projects, it is difficult to give the judgment result accurately by general evaluation methods. Aiming at this problem, a fuzzy hierarchical project comprehensive evaluation model based on entropy weight theory is proposed. Through the application of the evaluation model in specific power grids, its feasibility and effectiveness have been verified, and it can provide effective evaluation methods and decision-making references for actual distribution network project construction.