云南大理光伏±30kV柔性直流输电工程过电压研究与绝缘配合
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Research on Overvoltage and Insulation Coordination for Converter Station of ±30 kV Flexible DC Transmission Project in Dali of Yunnan
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
    摘要:

    为合理确定±30kV低压柔性直流输电工程设备的绝缘水平和配置避雷器,基于云南大理光伏升压±30kV柔性直流工程,利用PSCAD/EMTDC对工程换流站的暂态过电压进行了计算,并根据计算结果进行绝缘配合研究。研究结果对工程换流站设备的选型和制造具有指导意义,也为低压柔直输电工程的建设提供了参考依据。

    Abstract:

    In order to decide the insulation level of the equipment in converter station of ± 30 kV flexible low voltage DC transmission project reasonably and configure the lightning arresters, based on Dali photovoltaic boost ± 30 kV flexible DC project in Yunnan, the transient overvoltage of converter station is calculated with PSCAD / EMTDC. According to the calculation results, the insulation coordination is studied. The research results have a significance on guiding the type selection and manufacturing of converter station equipment, and also provide a reference for the construction of flexible low voltage direct transmission project.

    参考文献
    相似文献
    引证文献
引用本文

陈卓,蒋艾町,梁亚博,夏雪.云南大理光伏±30kV柔性直流输电工程过电压研究与绝缘配合[J].四川电力技术,2021,44(1):14-19.
Chen Zhuo, Jiang Aiting, Liang Yabo, Xia Xue. Research on Overvoltage and Insulation Coordination for Converter Station of ±30 kV Flexible DC Transmission Project in Dali of Yunnan[J]. SICHUAN ELECTRIC POWER TECHNOLOGY,2021,44(1):14-19.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-08-25
  • 出版日期: