Abstract:Based on the cascade development of Baoxing river and AGC system of joint scheduling of cascade hydropower stations,how to realize the AGC of joint scheduling of cascade hydropower stations is described according to the variation of unit head,interval flow and ecological flow,and the corresponding programming scheme for computer monitoring system is proposed. The joint scheduling test of plant station,centralized control center and provincial dispatching center is carried out,which improves the water utilization.