Aiming at the problem that abandoning wind is still prominent because of the insufficient peak load regulation capacity of wind turbine,the effect of thermal inertia of the system on the control of co-generation unit is analyzed. It is considered that the follow-up of generation load response of conventional control system of co-generation unit is delayed for a long time,which cannot meet the requirements of fast response and cannot participate in peak load regulation in real time,so an improved control scheme is proposed to solve this problem. Through the Matlab/Stateflow simulation software,the results show that the improved control scheme is significantly better than the conventional control scheme,the response of power load response index is fast and the follow-up performance is good,which provides the preconditions for co-generation units to participate in grid peak load regulation
参考文献
相似文献
引证文献
引用本文
叶晨,李红军,唐志东,崔双喜,孙凯.热电联产机组的控制优化策略研究[J].四川电力技术,2020,43(2):7-11+6. Ye Chen, Li Hongjun, Tang Zhidong, Cui Shuangxi, Sun Kai. Research on control Optimiaztion Strategy for Co-generation Unit[J]. SICHUAN ELECTRIC POWER TECHNOLOGY,2020,43(2):7-11+6.