Abstract:Aiming at the negative current phenomenon of three - phase three - wire electric energy meter correctly connected in electricity information acquisition system,the measurement principle and the phasor diagram are used to summarize the laws from the perspective of power factor,and the general conclusion is verified by the nature of the load and the field work.