Abstract:Because of the fluctuation of wind power generation,in order to avoid the impact of grid integration on power grid and its influences,PLC control system of Siemens S7 - 200 series is applied to energy storage system to reduce the fluctuation of wind power. According to the control requirements of hybrid energy storage system composed of battery and ultracapacitor, the hardware wiring diagram of PLC is drawn. The control process of hybrid energy storage is analyzed,and PLC is programmed using PLC programming software. Finally,the feasibility of the proposed control strategy is verified.