Abstract:The traditional network structures such as single power branch, single-supply single ring, double-supply single ring, three-supply single ring and multi-segment with multi-contact and so on adopted widely in 10 kV overhead lines are analyzed, and the common problems are explained. On this basis, self-ring inter-connection mode is proposed accordingly The advantages of this kind of connection mode are demonstrated from the flexibility, power supply reliability, influence of abnormal mode, load rate and so on, which provides a more scientific reference scheme for the planning and reform of 10 kV overhead lines in Beijing.