Abstract:Aiming at the lack of power resource locations and transmission corridors in the development of urban distribution network,a new optimization method for feeder link is presented,which can satisfy N - 1 verification and substantially enhance total supply capacity ( TSC) of distribution network. Firstly,a precise definition of interior transfer path ( ITP) and feeder transfer path ( FTP) is proposed and their effect under various faults is analyzed,which are on the basis of TSC and N - 1 fault verification of bus. And then the constraints of main transformer,feeder and switch capacity before and after the fault are considered synthetically,and the best plan of exterior feeder transfer path ( EFTP) construction is proposed,which can enhance TSC of distribution network and control costs effectively. Finally,the results of calculation examples show that the proposed method is effective.