Abstract:Combined with the specific situation of Sichuan power grid,the black - start path generation method and the load recovery strategy in black startup are studied. A practical method for calculating load recovery quantity and recovery speed is presented as well as the automatic checking technology of transient stability,overvoltage and other problems in the operation of black startup. On this basis,a set of black - start scheme formulation and decision support system is developed. The proposed system is used to formulate the recovery plan of Sichuan power grid,and gives the reference value of load impact and the recommended recovery strategy in the early stages of black - start in the system where black - start power supply is hydropower units.