Abstract:According to the requirements of repair cycle,and combined with the particularity and defect features of hydroelectric power plant B,the defect elimination scheme for the runner chamber is formulated. Based on the thought of modularization,the compensation block is proposed to eliminate the defects,which divides the runner chamber into multiple modules and replaces those defective modules with the compensation block. And,the application of the proposed modular defect elimination technology to the overall replacement process of runner chamber is studied.