    以新疆电网实际运行中遇到的调峰与新能源出力之间的矛盾为出发点,通过基于极端学习机的预测方法,以 调峰能力和电力平衡约束为主要手段,确定新疆电网满足调峰要求的最小开机方式与最大新能源出力的最优解,实 现经济调度、智能调度。

    Abstract:

    Taking the contradictions between load shaving and new energy output encountered in the actual operation of Xinjiang power grid as a starting point,and taking the peaking capability and power balance constraints as the main means,the optimal solutions for the minimum start - up mode and the maximum new energy output to satisfy the requirements of peak shaving in Xinjiang power grid are determined through the prediction methods based on extreme learning machine ( ELM) to achieve the economic dispatch and intelligent scheduling.

    参考文献
    相似文献
    引证文献
引用本文
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2022-05-24
  • 出版日期: