山区输电线路全过程机械化施工设计方案研究
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TM75

基金项目:


Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
    摘要:

    输电线路全过程机械化施工主要工序包括物料运输、基础施工、组塔施工、架线施工、接地敷设等。受地形及 交通影响,山区输电线路推进全过程机械化施工存在一定困难。结合川渝三通道 500 kV 线路工程特点,对山区全过 程机械化施工方案进行研究,并对现场实施情况进行总结。针对主要工序、子工序提出了设计优化措施,为同类地区 实施全过程机械化施工提供借鉴参考。

    Abstract:

    The whole mechanized construction in transmission line has several main processes,including material transportation,foundation construction,tower installation,installation of overhead conductors and ground wires,grounding work and so on. Because of severe traffic condition in mountainous areas,it is difficult to promote the mechanized construction in whole process. Combined with the characteristics of the third - channel of 500 kV transmission line connected to Sichuan and Chongqing,the construction programs of whole process mechanized construction in mountainous areas are studied,and the implementation experiences in this project are summarized. The optimized measures of design are put forward for the main processes and sub - processes,which provides a reference for the whole process mechanized construction under similar condition.

    参考文献
    相似文献
    引证文献
引用本文

廖庆,刘翔云,李澄宇,李力,李陈,胡振兴.山区输电线路全过程机械化施工设计方案研究[J].四川电力技术,2017,40(5):78-83.
Yan Xiuqing, Liu Xiangyun, Li Chengyu, Li Li, Li Chen, Hu Zhenxin.[J]. SICHUAN ELECTRIC POWER TECHNOLOGY,2017,40(5):78-83.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2022-06-22
  • 出版日期: